Finally a break in the rainy weather allowed us to get the concrete flatwork sub on board to prepare the basement slab and the "porte cochere" slab for pouring concrete.
First up was the termite treatment.
Next was digging the perimeter footing out and forming edges of the porte cochere slab.
Installed the reinforcing and plastic.
Same thing on the basement slab.
Passed inspection on Wednesday.
Showing posts with label Formwork. Show all posts
Showing posts with label Formwork. Show all posts
Thursday, December 19, 2013
Saturday, November 23, 2013
Forming & Pouring Walls.
According to Hubby, these residential concrete workers blow any commercial/industrial concrete workers out of the water. They are super fast at what they do. They came, they saw, they formed and poured in less than two days.